How to calculate a reorder point (with a free calculator)
The reorder point formula in plain words, how to pick a safety stock, a worked example and a calculator that tells you when to order more.
A reorder point is the stock level that tells you to order more. The formula is: reorder point = average units used per day × lead time in days + safety stock. Lead time is the number of days from placing an order to having it on the shelf, and safety stock is the extra you keep for busy days or late deliveries. Sell 4 a day, wait 10 days for delivery and keep 12 extra, and you reorder when you're down to 52.
Work out yours
🧮 Calculator · your numbers
When should you reorder?
Nothing you type leaves this page. Use your own sales history for the daily number; for things that sell unevenly, use a busy week’s average.
Type how many you have now as well, and it tells you how many days you have before you hit the reorder point.
The three numbers, and where to get them
Units used per day. Take what you sold or used over a recent stretch and divide by the days. Four weeks is a good window: long enough to smooth out one odd day, short enough to reflect now. For something seasonal, use the same weeks last year, or your busiest recent week.
Lead time. Count from the day you place the order to the day the stock is counted and on the shelf, not the day the supplier says it ships. Include weekends, customs and the day it takes you to unpack.
Safety stock. This is your cushion. A common rule of thumb:
Safety stock = (most you've sold in a day × longest lead time) − (average per day × average lead time)
That covers a bad week where sales spike and the delivery is slow. If that comes out bigger than you can afford to hold, start smaller on slow, cheap items and keep the cushion for the products where running out loses you a customer.
A worked example (made up)
A shop sells handmade candles:
| Average sold per day | 4 |
| Most sold in one day lately | 7 |
| Usual lead time | 10 days |
| Longest lead time so far | 14 days |
Safety stock = (7 × 14) − (4 × 10) = 98 − 40 = 58. That's a big cushion, so the owner settles on 20 for now and watches it.
Reorder point = 4 × 10 + 20 = 60. When the shelf count drops to 60, they reorder.
How much to order
The reorder point says when; how much depends on your cash, your space and the supplier's minimum order. A simple start: order enough to last until the next time you'd naturally reorder (say, a month of sales), rounded to the case size the supplier sells. Businesses with steady demand sometimes use the economic order quantity (EOQ) formula, which balances ordering costs against storage costs.
When the number stops working
Recalculate when:
- a product starts selling faster or slower (after a promotion, a season change, a new listing),
- a supplier's lead time changes,
- you run out even though you followed the reorder point (the cushion was too small), or
- stock sits long after the new order arrives (it was too big).
A reorder point only works if the count is right. If counts drift, start with how to keep track of inventory for a small business.
Checklist
✓ Checklist · tap to tick
Set reorder points for your stock
Your ticks stay on this device only.
With BoxTrack
Turn on the Reorder at field and type each product's reorder point. Anything at or under it shows as low, so a quick look tells you what to order, and the low list can be your first screen. Snap a shelf to update what's there, search any SKU, and print QR labels for each location. BoxTrack doesn't place orders or read your sales; you update the counts.
Questions
What is the reorder point formula?
The reorder point formula is average daily usage times lead time in days, plus safety stock. For example, selling 4 units a day with a 10-day lead time and 12 units of safety stock gives a reorder point of 52 units.
How do you calculate safety stock?
A common way to calculate safety stock is the most you've sold in a day times your longest lead time, minus your average daily sales times your average lead time. It covers a stretch where sales spike and the delivery is late at the same time. Start smaller on cheap, slow items if that cushion is too costly to hold.
What is lead time in inventory?
Lead time is the number of days from placing an order to having the stock counted and ready to sell. Measure it from your own past orders, including shipping, customs and unpacking, rather than the supplier's shipping estimate.
What's the difference between a reorder point and safety stock?
Safety stock is the extra stock you keep as a cushion; the reorder point is the level at which you order more. The reorder point includes the safety stock plus what you expect to sell while you wait for the delivery.
How often should I recalculate reorder points?
Recalculate reorder points each season, and any time a product's sales or a supplier's lead time changes, or when you run out despite following the number. Stock left sitting long after a delivery arrives is also a sign it's set too high.
